Proposed Elementary Renovations
1 Update Hallway Walls
Remodel remainder of the school (as indicated in orange above) to match the Pre-K wing which was remodeled after Winter Storum URI. This will involve removing the vinyl wall coverings and replacing and/or repairing the sheet rock. A water resistant base will be installed at the bottom of the walls and covered by tile. The hallways will be further updated as needed.
Pictured above is the remodeled Pre-K wing on the the left and one of the hallways to be remodeled on the right.
2 Replace Flat Windws
Remodel remainder of the school flat windows (as indicated in blue above) to match the Pre-K wing flat windows that were remodeled after Winter Storum URI. This will involve removing the existing frames and installing a new aluminum frame flush with the outside of the window to prevent water pooling.
Pictured above is one of the new windows installed in the Pre-K wing.
3 Remodel Large Playground
Remodel the large playground (as indicated in green above). The remodel will involve removing the pea gravel and installing an ADA compliant sufrace as well as ensuring ADA compliant play areas.
Pictured above is the existing playground.
Proposed High School Renovations
1 Replace Walls Around Library
Remodel walls around the library (as indicated in blue above) and the classes by the office which are thin metal and glass. This will require removing the walls and doors and replacing with standard classroom walls and doors.
Pictured above is one of the side doors into the library.
2 Renovate Gym Area
Remodel high school gym bathrooms, gym sound tiles and paint gym walls (as indicated in green above). The bathrooms will be remodeled to be ADA compliant. The sound tiles will be replaced with new sound absorbing materials, and the gym walls will be repainted.
Pictured above an existing gym wall with sound tiles and one of the gym bathrooms.
3 Renovate Band Hall
Remodel the band hall (as indicated by yellow above) including the entryways, walls, and sound absorbing materials. Install locking instrument shelves or lockers.
Pictured above is the existing band hall.
Proposed Junior High School Renovations
1 Replace Facia
Replace facia aorund the perimeter of the Junior High building with a more modern and durable facia.
Pictured above is the existing facia
2 Renovate Playground
Renovate the Junior High playground which currently consists of only a swing set.
Pictured above is the existing playground area.
Additional Purposed Renovations